Mostrar más resultados

Generic selectors
Exact matches only
Search in title
Search in content
Post Type Selectors

Projects

Refurbishment and partial restructuring of hotel

Type of construction: Hotels and tertiary sector buildings
Basic and execution project for the refurbishment and partial restructuring of the Hotel Emperatriz.
Year: 2015
Location: C. de López de Hoyos, 4, Salamanca, 28006 Madrid
Developer: Barceló Arrendamientos Hoteleros, S.L.
PEM: 6.430.000,00€
Keywords: Health and Safety Coordination in Execution Phase, Healthcare, Educational and Tertiary, Hotels and tertiary sector buildings

Execution of a new pharmaceutical plant

Type of construction: Pharmaceutical plants
Detailed design project for a new pharmaceutical plant in Meco, AH-9 “Industrial Parque”
Year: 2019
Location: C. Zeus, 16, 28880 Meco, Madrid
Developer: Laboratorios Alter S.A.
Built area: 17.216,40m2
PEM: 40.916.280,63€
Keywords: Health and Safety Coordination during the Execution Phase, Pharmaceutical and Laboratory Sector, Pharmaceutical plants

New building construction

Type of construction: Public facilities and administrative buildings.
Construction of the BIP UAD-RAS II/31 building at “El Goloso” base, Madrid.
Year: 2017
Location: Base El Goloso, Fuencarral-El Pardo, 28049 Madrid
Developer: Ministerio de Defensa (Dirección de Infraestructura E.T.)
Built area: 2.633,34m2
PEM: 2.241.527,50€
Keywords: Health and Safety Coordination during the Execution Phase: Healthcare, Educational and Tertiary; Public facilities and administrative buildings.

Construction of residential building with swimming pool and garage

Type of construction: New-build construction
Basic project for 101 dwellings, swimming pool and garage at 15 Irún Street. Madrid
Year: 2018
Location: C. de Irún, 15, Moncloa – Aravaca, 28008 Madrid
Developer: Global Incahuasi S.L.U
Built area: 9.747,00m2
PEM: 10.995.257,14€
Keywords: Health and Safety Coordination during the Execution Phase, Building Construction, New Build, New Building, Swimming Pool, Garages

Urban development project

Type of construction: Urbanization and Outdoor Spaces
Complementary Urbanization Works Project in AH-9 “Industrial Park”
Year: 2019
Location: C. Zeus, 16, 28880 Meco, Madrid
Developer: Laboratorios Alter S.A.
Built area: 23.175,00m2
PEM: 344.425,98€
Keywords: Safety and Health Coordination in Execution Phase, Civil Works, Urbanization and Outdoor Spaces

Other categories

Building Construction

View Projects

Civil Engineering

View Projects

Industrial and Logistics

View Projects

Pharmaceutical Sector and Laboratories

View Projects

Special Projects

View Projects

Technical Installations and Works

View Projects

Contact us

Integrated prevention, safe technical decisions, and a common goal:
ZERO accidents.

Request information

Do you have any questions? We are here to help you.

Basic information on Data Protection Controller: GESTIÓN PREVENTIVA EN OBRA, S.L.P.U. Purpose: To obtain your consent to respond to the questions you submit to us and to request a quote through our contact form. Legal basis: Data subject’s consent.
Recipients: Data will not be disclosed to third parties, except where legally required.
Rights: Access, rectify and erase the data, as well as other rights, as explained in the additional information.
Additional information: You can consult additional and detailed information on Data Protection at the following link: https://gespreobra.com/en/privacy-policy/